|
|
|
Bridge at the GreenThe Bridge at the Green crosses the Battenkill River about 4 miles northwest of the 7A-313 junction.
Directions: Take 313 west from the junction of 313 and 7A in Arlington for about 4 miles. The bridge will be easily visible on your left. If you are going back to Arlington, you can take the East River road which runs parallel to 313. It's a pretty rural road and is unpaved in most sections. |
|
|